Free PPAP checklist template (Excel)

A ready-to-use PPAP checklist in Excel - all 18 elements from the design record to the PSW sign-off, with Required, Status and Remarks columns and a header for part, supplier, level and date. No email form, no sign-up - just download and start ticking.

What PPAP is — in plain words

PPAP stands for the Production Part Approval Process. Before a customer lets you supply a part in volume, they want proof you can make it to the drawing, every time. PPAP is that proof, gathered into one package of up to 18 elements — from the design record and drawings, through the FMEA (your list of what could go wrong) and the control plan (what you check, with which gauge, how often), to the measurement studies, dimensional results and the final sign-off sheet, the PSW (Part Submission Warrant).

This template lists all 18 elements as a clean Excel checklist with a header for the part, supplier, PPAP level and date, and columns to mark whether each element is Required, its Status (Submitted, NA or Pending) and any Remarks. A couple of clearly-marked sample rows show the idea; delete them and it is yours.

free-ppap-checklist-template.xlsxFormatted Excel checklist · all 18 elements · Status & Remarks · sample entries
Download free

Ungated direct download — no email required. Works in Excel, LibreOffice and Google Sheets.

What is inside the template

Two parts: a short header for traceability, then the 18-element checklist. Here is the structure.

Header (traceability)

FieldWhat it captures
PartThe part number or name being submitted
SupplierYour company / plant as the supplying party
PPAP LevelThe submission level (1–5) the customer requires
DateThe submission date

The 18 PPAP elements — columns: Element, Required?, Status, Remarks

#ElementWhat it is
1Design recordsThe approved drawing / CAD data for the part
2Authorised engineering change documentsAny approved changes to the design
3Customer engineering approvalCustomer sign-off where required
4Design FMEA (DFMEA)Failure-mode analysis of the design
5Process flow diagramThe steps your process runs through
6Process FMEA (PFMEA)Failure-mode analysis of the process
7Control planWhat is checked, with which gauge, how often
8Measurement system analysis (MSA)Gauge R&R and other studies proving the gauges measure right
9Dimensional resultsMeasured results against the drawing
10Material & performance test resultsMaterial certificates and performance tests
11Initial process studies (SPC)Capability (Cp/Cpk) on key characteristics
12Qualified laboratory documentationProof the test lab is accredited
13Appearance approval report (AAR)For parts with appearance requirements
14Sample production partsActual parts from the production run
15Master sampleA signed-off reference part
16Checking aidsFixtures / gauges used to check the part
17Customer-specific requirementsAnything the customer additionally demands
18Part Submission Warrant (PSW)The summary sign-off sheet for the whole package

Each of the 18 rows in the Excel file carries a Required? flag, a Status (Submitted / NA / Pending) and a Remarks box, so at a glance you can see what is done and what is still open.

How to use the PPAP checklist

Fill the header

Record the part, supplier, PPAP level and date so the checklist is tied to one submission.

Mark each element Required or NA

Go down the 18 elements and set which apply for this part and submission level.

Track status as you go

Set each element to Submitted, NA or Pending, and note details in Remarks so nothing is missed.

Close with the PSW

When every required element is Submitted, complete the Part Submission Warrant and send the package for approval.

Want this automatic instead of a spreadsheet?

A checklist is perfect for your first submissions. But a PPAP package is only as good as the versions inside it — and once you manage many parts, keep the FMEA, control plan and MSA current, and re-submit when an engineering change lands, a spreadsheet cannot hold the versions together.

In Fast Quality Software, the PPAP package is assembled from the very records your APQP produced — the DFMEA/PFMEA, process flow, control plan and MSA studies — each stored as a version-controlled document with an Accepted / Rejected / Accepted-Under-Deviation status, tracked on a PPAP dashboard by part and submission level. Nothing is re-keyed, and an approved engineering change triggers a re-submission automatically. Learn the process first in what is PPAP and APQP & PPAP for Indian auto suppliers, or see it run live.

free-ppap-checklist-template.xlsxFormatted Excel checklist · all 18 elements · Status & Remarks · sample entries
Download free

Ungated direct download — no email required. Works in Excel, LibreOffice and Google Sheets.

Where to go next

Common questions

What is PPAP in plain words?
PPAP stands for the Production Part Approval Process. It is the package of evidence a customer wants before they let you supply a part in volume - proof that you can make it to the drawing, consistently. It bundles up to 18 elements, from the design record and drawings to the FMEA, control plan, measurement studies, dimensional results and the final sign-off sheet called the PSW (Part Submission Warrant).
Is this PPAP checklist really free?
Yes. The Excel file downloads directly with no email form and no sign-up. Open it, tick off your 18 elements, and share it with your team or your customer freely.
What are the 18 PPAP elements?
They are: design records; authorised engineering change documents; customer engineering approval; DFMEA; process flow diagram; PFMEA; control plan; measurement system analysis (MSA); dimensional results; material and performance test results; initial process studies (SPC); qualified laboratory documentation; appearance approval report; sample production parts; master sample; checking aids; customer-specific requirements; and the Part Submission Warrant (PSW). The template lists all 18 with a status and remarks column.
What are PPAP submission levels?
The submission level (Level 1 to Level 5) sets how much of the package you actually send to the customer versus keep on file. Level 3 - full submission - is the most common default. The checklist has a header field for the level so everyone knows what is expected for this part.
When should I move from a spreadsheet to PPAP software?
A checklist is a great start for one or two submissions. Once you are managing many PPAP packages, pulling elements like the FMEA and control plan from live records, and re-submitting when an engineering change lands, a spreadsheet cannot keep the versions straight. Fast Quality builds the PPAP package from the same records your APQP produced, so nothing is re-keyed and every element is version-controlled.

See PPAP build itself from your APQP

Book a walkthrough and watch a PPAP package assemble from live FMEA, control-plan and MSA records — version-controlled, on your own part.

Book a demo View pricing
Built in Pune by Improsys
Cloud & on-premise
On-site setup & training